Every method, each and every segment, each perform in EPG is demanded to be completed 1 stage pursuing yet another, very carefully and cautiously, from content variety, reformation to production components, from components warmth treatment to automated assembly, from good quality handle to product inspection and tests and from purchase working to following product sales support. We will offer best companies and high top quality merchandise with all sincerity. EPG has established up a total established of top quality administration program which is offered with advanced inspection and examination equipment.
EPTT EPTT Front Leg Skinning Slaughtering EPT agricultural EPTTry
The automated conveyor primarily EPTs EPTTltaneously with the automated conveyor line of the hind legs, recognizing well balanced pre-stripping, slicing the sheep head, hanging the sheep’s entrance hoof after reducing the hind legs, taking away the shoulder, peeling, peeling, slicing the entrance limb, and so forth.
installtion and operate examination:
1) the EPTT can only leave the manufacturing facility following strict inspection, debugging and standard procedure before leaving the manufacturing unit. But right after leaving the manufacturing facility may possibly be thanks to transportation, loading and unloading and other aspects triggered by inadequate operation and other failures, so before set up have to have out a comprehensive inspection to ensure that all parts are in great situation right after installation
2) the equipment ought to be put in in a sensible situation according to the technological needs, and need to be equipped with the bloodletting table and the hoist
3) examining the belt tightness and altering if it is located to be abnormal
four) incorporating lubricating oil to the rotating components
five) soon after installation, the test operate is adopted to check regardless of whether the procedure of every mechanism is stable or not. If no blocking or abnormal phenomenon is located after no-load procedure, it can only be set into use.
the point of operation basic safety
one) the operator should first read the specification of v-sort limited conveyer, recognize its structure, overall performance, basic safety laws, and many others.
2) the person must establish the principles and rules associated to the products and the basic safety procedure principles.
3) the operator ought to have the expertise of mechanical and EPT procedure and be healthy
four) the operator need to be educated on the job, acquainted with the secure operation procedure, and hold the certificate for the publish
5) the operator ought to spend attention to the safety and do the protecting steps effectively.
6) No load procedure inspection ought to be carried out just before every single shift
seven) it is strictly prohibited to set hand or other items into the conveyor belt whilst the EPTT is doing work, in orEPTTto avert harm to folks or hurt to EPTT
8) if the conveyer has irregular doing work audio, it should cease and check out instantly to avert the EPTT from causing serious harm. The man or woman is wounded, and put up the signal prompt
9) the EPTT need to be cleaned and preserved at the time of halting, and should confirm that the EPTT supply has been lower off and set up a sign
ten) following working, shut off the EPTT and reduce off the EPTT provide
Make contact with us